| Brief Legal Description | COMBO W/#26.4 PER REQ IN 2026* 30-2N-29W: COM AT SE COR OF SW4 OF SE4 , THN N02*45'09"E 5.52FT TO N R/W TUNNEL RD, THN N86*50'05"W 2.61FT ALNG N R/W, THN N87*48'54"W 399.27FT ALNG N R/W TO POB, THN N87*48'54"W 15.25FT ALNG N R/W, THN N88*02'03"W 74.93FT ALNG N R/W, THN N02*48'19"E 514.58FT , THN S87*22'25"E 89.15FT , THN S02*41'31"W 513.59FT TO N R/W & POB, AS DES IN REQ DTD 01NOV24 (OUT OF #26 IN 2025). & OR 4600 PG 1225 , LESS OR 4723 PG 175 (NOW #26.5 FOR 2026) *** & TOG W/#26.4 PER REQ IN 2026 DES AS FOLLOWS:********** COM AT SE COR OF SW4 OF SE4 , THN N02*45'09"E 5.52FT TO N R/W TUNNEL RD, THN N86*50'05"W 2.61FT ALNG N R/W, THN N87*48'54"W 309.09FT ALNG N R/W TO POB, THN N87*48'54"W 90.18FT ALNG N R/W, THN N02*41'31"E 513.59FT , THN S87*22'25"E 89.15FT , THN S02*34'41"W 512.90FT TO N R/W & POB, AS DES IN REQ DTD 01NOV24 (OUT OF #26 IN 2025). & OR 4600 PG 1225 |
|---|