| Brief Legal Description | PARCEL 2-B GIN ROAD WEST AN UNREC SUB FURTHER DES AS: COMMENCE AT THE NORTHWEST CORNER OF SECTION 40, TOWNSHIP 3 NORTH, RANGE 30 WEST, SANTA ROSA COUNTY, FLORIDA; THENCE SOUTH 01 DEGREES 21 MINUTES 08 SECONDS WEST ALONG WEST SECTION LINE FOR 1635.81 FEET; THENCE DEPART SAID WEST LINE AND RUN SOUTH 88 DEGREES 38 MINUTES 52 SECONDS EAST A DISTANCE OF 494.91 FEET; THENCE RUN SOUTH 1 DEGREES 21 MINUTES 08 SECONDS WEST A DISTANCE OF 643.53 FEET; THENCE SOUTH 88 DEGREES 38 MINUTES 52 SECONDS EAST FOR 299.40 FEET TO THE POINT OF BEGINNING; THENCE SOUTH 88 DEGREES 38 MINUTES 52 SECONDS EAST FOR 264.00 FEET; THENCE SOUTH 01 DEGREES 21 MINUTES 08 SECONDS WEST FOR 871.77 FT TO NORTH MAINT/CLAIM OF MOLINO BRIDGE RD (BEING DESC AS ESMNT OR 3539/1039) THENCE NORTH 69 DEGREES 34 MINUTES 30 SECONDS WEST 279.33 FEET; THENCE NORTH 01 DEGREES 21 MINUTES 08 SECONDS EAST A DISTANCE OF 780.49 FEET TO THE POINT OF BEGINNING SUBJ TO A 20' ESCAMBIA RIVER COOPERATIVE UTILITY ESMNT ALONG THE N MAINTENANCE CLAIM OF MOLINO BRIDGE ROAD. & ALSO TOGETHER WITH 60' INGRESS/EGRESS/UTILITY EASEMENT PER OR 3539 PG 1039 LL AS DES IN OR 4036 PG 649 (OUT OF #2.13 FOR 2017) (OR 3717 PG 340 FOR #2.26 & OR 3721 PG 1822 NOW #2.28 BOTH MADE FOR 2018) THIS IS REM; LESS ALL MINERAL RIGHTS |
|---|